![]() ![]() Letter Ballot 08-21-07 Submitted to Committee 8 for review and comment, Ĭ2-20: (previously C2-3-13): Review and update Part 20 - Flexible Sheet Pile Bulkheads. Letter Ballot 08-19-16 Submitted to Committee 8 for review and comment, Ĭ2-24: Revise and update Part 24-Drilled Shafts, Ongoing assignment. Ongoing assignment.Ĭ2-04: Review and Update Part 4-Pile Foundations, Ongoing assignmentĬ2-10: Review and update Part 10-Reinforced Concrete Pipes, Ongoing assignmentĬ2-22: Revise and update Part 22 - Geotechnical Subsurface Investigation. Ongoing assignment.ĭ1-1-15: Direct Fixation Manual Material. Ongoing assignment.Ĭ1-27: Review and update Part 27 – Concrete Slab Track and associated Commentary. ![]() Ongoing assignment.Ī26-1-07: Update Part 26 - Segmental Bridge Construction. Ongoing assignment.Ĭ1-26: Review and update Part 2 - Recommendations for the Design of Segmental Bridges. Ongoing assignment.Ĭ1-19: Review and update Part 19 – Rating of Existing Concrete Bridges and associated Commentary. Ongoing assignment.Ĭ1-17: Review and update Part 17 – Prestressed Concrete and associated Commentary. Ongoing assignment.Ĭ1-16: Review and update Part 16 - Design and Construction of Reinforced Concrete Box Culverts and associated Commentary. ![]() Ongoing assignment.Īddition of high strength reinforcing steel and high strength concrete. D1-1-11: Address design of deep beam requirements, torsion requirements, strut and tie modeling and anchoring dowels into concrete to be included in Part 2. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
March 2023
Categories |